Measure the wall face, retained height, drainage zone thickness, and base trench separately. Includes measurement steps, field units, formulas, example quantities, and assumptions.

12+Focused tools
USFirst units
FastStatic pages

Measure the wall face, retained height, drainage zone thickness, and base trench separately.

Retaining wall backfill zone with clean drainage stone
Source image selected from free-use web photography collections.. Free-use web license; see Editorial Policy image log.
Measuring setup

Tools to have ready

  • Tape measure
  • Wall layout plan
  • Level
  • String line
  • Manufacturer guide
Step by step

How to take the measurements

1

Measure the total wall length along the front face.

2

Measure retained height from base to finished grade.

3

Confirm drainage rock thickness behind the wall.

4

Measure base trench width and depth if ordering base rock.

5

Keep drainage zone and base trench quantities separate.

Measurement diagram

Retaining-wall cross-section

drainage zone wall height
  1. 1Wall blocks
  2. 212 in drainage rock
  3. 3Drain pipe
  4. 4Compacted base trench
Formula

How the calculator works

Drainage rock = wall length x wall height x zone thickness. Base = length x trench width x trench depth.

Example loose order 4.89 cu yd Example weight 6.60 US tons

Example: a 30 ft wall, 3 ft high, with a 1 ft drainage zone uses 90 cubic feet before waste.

Field guide

What every field and unit means

Wall length

Total wall length along the face.

Unit: ft or m. Measure along straight sections and add them together.

Wall height

Backfilled wall height used for drainage rock.

Unit: ft or m. Measure from base grade to retained grade.

Drainage-zone thickness

Depth of clean stone behind the blocks.

Unit: ft or m. Measure straight back from the rear of the wall units.

Base trench width

Width of the compacted base trench.

Unit: ft or m. Measure the excavated trench width below the first course.

Base trench depth

Depth of the base trench stone.

Unit: ft or m. Measure finished compacted base thickness in feet.

Wall-rock density

Bulk density for clean wall rock.

Unit: lb/ft3 or kg/m3. Use supplier density for the selected drainage aggregate.

Extra / waste

Percent added for cuts, spillage, edge cleanup, and small estimating errors.

Unit: percent. Use 5 percent for simple square work and 10 percent or more for irregular work. Do not enter 0 when the shape has curves, tapers, or hand trimming.

Price per ton

Optional supplier price used to estimate material cost before delivery fees and taxes.

Unit: USD per US ton. Enter the quoted material price per US short ton. Leave 0 if you only need quantity.
Before ordering

Assumptions and limits

  • A 12 inch drainage zone is a common planning starting point.
  • Wall design and global stability are outside the calculator.
  • Use clean angular drainage aggregate when specified.
  • Does not replace engineered retaining wall design.
  • Does not size geogrid, pipe, or outlet.
  • Curved walls may need extra allowance.

Research basis: Allan Block water management guidance, NIST unit conversions. Full methodology and image-credit notes are maintained on the Editorial Policy page.