#57 stone is widely used for drainage, concrete base, driveways, and general aggregate projects. Estimate an order from finished dimensions and depth.

Verified formulaEditable presetsUS + metric
Purpose-built estimator

Project measurements

Choose project area or known cubic yards.

Surface area covered by #57 stone.

Finished #57 stone layer thickness.

Editable #57 stone bulk density.

Small allowance for settlement or placement.

Percent added for cuts, spillage, edge cleanup, and small estimating errors.

Optional supplier price used to estimate material cost before delivery fees and taxes.

Measurement diagram

#57 stone coverage

project area #57 depth
  1. 1Finished surface
  2. 2Washed #57 stone
  3. 3Specified depth
  4. 4Prepared base
Pile of #57 crushed stone aggregate ready for placement
Source image selected from free-use web photography collections.. Quantity assumptions are documented in the guide and Editorial Policy.
How to use this calculator

Measure, verify, and order

Read full measuring guide

Measure the area and specified layer thickness, or convert a known cubic-yard quantity into tons.

1

Choose area/depth or known yards.

2

Enter #57 layer depth.

3

Override supplier density when known.

Field and unit guide

What each input means

Starting measurement

Choose project area or known cubic yards.

Use known cubic yards from plans or area/depth from measurements.

Project area

Surface area covered by #57 stone.

Unit: sq ft or m2. Measure or calculate total square feet.

Known volume

Known cubic yards of #57 stone.

Unit: cu yd. Enter plan or supplier volume directly.

Stone depth

Finished #57 stone layer thickness.

Unit: in or cm. Measure the specified layer depth.

Supplier density

Editable #57 stone bulk density.

Unit: lb/ft3 or kg/m3. Replace the default with supplier tons per yard or density.

Compaction allowance

Small allowance for settlement or placement.

Unit: percent. Set to 0 for loose drainage placement if appropriate.

Extra / waste

Percent added for cuts, spillage, edge cleanup, and small estimating errors.

Unit: percent. Use 5 percent for simple square work and 10 percent or more for irregular work.

Price per ton

Optional supplier price used to estimate material cost before delivery fees and taxes.

Unit: USD per US ton. Enter the quoted material price per US short ton. Leave 0 if you only need quantity.
Worked example

Check the calculation

Example: 200 sq ft at 4 inches deep equals about 2.47 cubic yards before allowances.

A 20 × 10 ft area at 4 inches deep contains 2.47 compacted cubic yards before allowances.

Total loose order 2.86 cu yd Total weight 3.86 US tons

Volume = area x depth, or use known cubic yards. Weight = volume x density.

Before ordering

Assumptions to check

  • The calculator uses 100 lb/ft³ as a planning density.
  • Regional #57 gradations and weights vary.
  • Confirm whether your supplier sells by ton or cubic yard.
  • Does not verify gradation compliance.
  • Does not design drainage systems.
  • Washed and unwashed products can behave differently.

Read our formulas, sources, image credits, and review policy

Frequently Asked Questions

What does this #57 stone calculator calculate?

It uses project-specific inputs and the formula shown below. Volume = area x depth, or use known cubic yards. Weight = volume x density.

Are the presets exact specifications?

No. Presets are editable planning starting points. Confirm depths, materials, and densities with the supplier, manufacturer, or project designer.

Why can delivered weight differ?

Bulk density varies by supplier and moisture level. Moisture, gradation, compaction, and scale accuracy can change the delivered weight.